The outside of the house is basically finished.
Here is a small shot of the living/kitchen area. The pantry door is the first to the left. The french doors open into the office.
This week cabinets are being stained and installed, tile floor is being put down in the bathrooms and laundry room, and light fixtures and fans are going in. The front door is now on and the garage door will be coming soon. Peter has decided to install the wood flooring in the main area to save us nearly $3000 in labor costs.
I have been looking up how to make curtains for the living room and kitchen. Lots of fun!